- Country: Qatar
- Client: beIN
- System Information
- Hoists: Desiti Spider Junior
- Control Panel: Desisti HDC Digital Hoists control System
- Luminaires: Desisti Leonardo LED 120W
- Desisti Soft lights deluxe 330W
- Desisti Leonardo 2500W
- Desisti 120W Daylights
Project Description
As a part of it’s upgrade plan, beIN decided to renew their First studio –Studio 1- to accommo date important events and programs.
INC System Integrations was awarded the project to upgrade the lighting system in the studio.
100 Motorized Hoists with DMX Option, with Several Types of luminaries were installed, in order to meet applications of dierent Programs in the studio. The project had to be completed in just 25 days in order to prepare the studio for the broad- casting of the Arab Games in Doha 2011, and African cup 2012. INC planned the project accordingly and completed the entire project in the requested timeframe, which resulted in a successful transition for beIN Sport.